We've had another few weeks of progress going on over here. Things are moving along...not always as quickly as we'd hope but they are moving. The most exciting things going on lately have been the interior paint going up on the walls, the pouring of our driveway (specially designed for Alyssa to not have 16 point turnarounds), and the exterior deck rails are all installed. The detail work on things continues to exceed our expectations (case in point, our exterior railings) and we eagerly anticipate our move in date as we get closer and closer. Speaking of which, the move in date last time we checked with Brian was mid-July but we're not hiring the movers just yet. There are still many more things to go and next up should be floor stain, countertop installation, fireplace stone, and more... There are lots more pictures in the album for those of you who want to take a look
Monday, June 23, 2008
Driveway, Interior Paint, Etc
We've had another few weeks of progress going on over here. Things are moving along...not always as quickly as we'd hope but they are moving. The most exciting things going on lately have been the interior paint going up on the walls, the pouring of our driveway (specially designed for Alyssa to not have 16 point turnarounds), and the exterior deck rails are all installed. The detail work on things continues to exceed our expectations (case in point, our exterior railings) and we eagerly anticipate our move in date as we get closer and closer. Speaking of which, the move in date last time we checked with Brian was mid-July but we're not hiring the movers just yet. There are still many more things to go and next up should be floor stain, countertop installation, fireplace stone, and more... There are lots more pictures in the album for those of you who want to take a look
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment